Waterloo Street, Newcastle

Places for People Group are one of the UKs largest property management, leisure management, development, and regeneration companies. One of our Larger scale customers who own & manage over 148,000 homes and have assets of more than £3billion.

For the project at Waterloo Street we were granted the Mechanical, Electrical & Plumbing works to all four low-rise blocks on the project which consist of 180 apartments.

Located in the heart of Newcastles Town Centre, the original stone front on the main street remains, whereas through the connecting alleyways, the red brick and glazed apartment blocks surround a small quiet haven of quiet woodland walkways.

The Mechanical works consisted of the central plantroom refurbishment were 2x new Potterton Sirius 250s & 2x Ideal Evomax 500s were installed. Along with a water filtration system, Building Management System Panel, Fire Alarm Control Panel, Heating Pressurisation Unit, Dosing Pot and various Heating & Domestic Controls and Valves which had reached the end of their lifespan.

Pipework insulation, Cladding and pipework Identification have also been replaced throughout our areas of our works to a high standard. So much so, that apart from the new appliances youd never have known we were there!

An entirely new combined flue system was installed to accommodate all the new boilers, of which was bespokely designed to accommodate the existing plantroom pipework & components, it then utilises the existing flue riser to run vertically though several floors to a new roof terminal.

The works to upgrade the heating systems saw the replacement of existing Heat Interface Units, and the design & installation of our Heatlink HIUs and integral control & metering system. Combined with a 135 litre Unvented Domestic Hot Water Storage Cylinder, both heating and domestic services were upgraded for performance and efficiency.

All testing & Commissioning for this project has been undertaken in-house and our systems have proved again to be very successful. Though technical in design, the easy to program and easy to use controls have allowed a seamless transition for the residents while all services have remained live during the works.


Project Details


ADDRESS

Waterloo St, Clayton St, Forth Place & Pink Lane, Newcastle, NE1 4DG


CLIENT

Place for People


WORKS

Replacement of Communal Heating System, Boilers, HIUs and Associated Works to apartments.


VALUE

£1,350,000.00







— RELATED CASE STUDIES
Civic Centre, Salford

Civic Centre, Salford

RPS Group were commissioned by Salford City Council to produce a Stage 3 design package associated with modifications to the heating and hot water systems to the Civic Centre in Swinton. The project

View Case Study
Delivering High-Performance Plumbing, Heating & MVHR for Castlemead Group LTD

Delivering High-Performance Plumbing, Heating & MVHR for Castlemead Group LTD

Rothwell Plumbing services have delivered plumbing heating & MVHR package to 23 residential properties for social rent for our client Castlemead Group LTD. The properties are aimed at small families,

View Case Study
Delivering Decarbonisation - Middlefields Waste Transfer Station

Delivering Decarbonisation - Middlefields Waste Transfer Station

RPS Group was appointed to design and deliver a rooftop solar pv system for Middlefields Waste Transfer Station through the NEPO Decarbonisation Framework. Operated by South Tyneside Council,

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.