We have been appointed principal contractor for Manchester City Council’s largest SHDF-funded retrofit programme of its type. An initial 220-property phase was extended through phases 2 and 3 to over 500 social homes – an ASHP-led whole-house retrofit delivered at scale to PAS 2030 and PAS 2035


Core works included Daikin ASHPs installed alongside cavity wall insulation, loft insulation, ventilation, fascias, soffits and rainwater goods – all to manufacturer instructions under PAS 2030. Every property began with a Pre-Installation Survey and a full PAS 2035 suitability inspection to identify building defects before works started.

We held the Retrofit Designer role, working alongside the client-appointed Retrofit Assessors and Coordinators. Certified commissioning engineers completed handovers through detailed resident demonstrations, using bespoke material
 


Outcomes:
  • Every completed property is now EPC C rated.

  • Residents report monthly bill reductions of up to £200.


Project Details


ADDRESS

North Manchester


CLIENT

Manchester City Council


WORKS

SHDF Retrofit






“We had our heat pump installed by RPS 3 months ago and we’re now saving £40 a month on bills – a huge saving for us as pensioners. RPS have been fantastic – the process was fabulous, with booklets, information and follow-up visits.” 

Marina Street, Manchester City Council Resident 



“RPS have always worked collaboratively and proactively with stakeholders.” 

Elliot Simm, Manchester City Council 



"We have worked with RPS over many years, the projects RPS has delivered with us have been technically difficult, often delivered through externally funded routes — which adds a further layer of complexity and hard targets. RPS has been an integral part of the teams delivering these projects successfully.

Their no-fuss approach makes the installation process as streamlined as possible, and their proactive site teams deliver a good on-site service for residents with minimal complaints. They have been reliable partners  and we would have no hesitation in working with RPS on future projects"

Elliot SimmCommercial, Design and Delivery Team Leader, Manchester City Council




— RELATED CASE STUDIES
North Tyneside Council, Planned Heating Installations

North Tyneside Council, Planned Heating Installations

RPS were successful securing a place on the North Tyneside Council Framework in 2019, and subsequent mini competitions during 2020 & 2021. During the delivery of this programme since 2019 and

View Case Study
South Lakes Housing ASHP Maintenance Contract

South Lakes Housing ASHP Maintenance Contract

Our client South Lakes Housing has recently awarded RPS a 5 year contract for the Service and Maintenance of Air Source Heat Pumps across their growing portfolio. This is one of the first contracts

View Case Study
The Grange, Blackpool Council

The Grange, Blackpool Council

As part of the Grange Park housing estate sustainability and carbon reduction project, RPS undertook the design, supply, and installation of a commercial air source heat pump (ASHP) system to replace

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.