Award winning developer, ‘Adlington in partnership with ‘Bardsley Construction have recently completed an £11.5 million luxury development of 55 retirement apartments at Alexandra Road, just a short walk from Southport town centre on Merseyside.

Rothwell Plumbing Services renewable energy department was privileged to provide the technical and installation expertise for the design and installation of a Solar Photovoltaic System which provides a supplementary renewable energy solution for the buildings total electricity power requirements.

The solution was to install 5 separate, but interlinked roof mounted Solar PV arrays totalling approximately 40kWp and producing an estimated 1450kWh of electricity annually with an expected reduction of the buildings CO2 emissions of approximately 17 tonnes each year. The Solar PV System covers approximately 140 square metres of roof space, incorporates 142 – 270 watt polycrystalline solar panels and is also predicted to provide significant cost savings on the buildings annual running costs over the lifespan of the Solar PV system.

The Solar Photovoltaic installation was completed over three weeks in early 2019 and our client, Bardsley Construction are delighted with the renewable energy system and proud of their contribution in helping protect the environment through positive design and application.

Project Details


ADDRESS

Southport, PR9 9HL


CLIENT

Bardsley Construction


WORKS

Commercial P.V. Installation


VALUE

£35,000.00







— RELATED CASE STUDIES
Delivering Retrofit works for One Manchester

Delivering Retrofit works for One Manchester

RPS were appointed to deliver Retrofit works For One Manchester including Positive input ventilation and Environmental monitoring. Tendered through Procure Plus RPS were appointed as sole contractor,

View Case Study
Delivering Decarbonisation - Middlefields Waste Transfer Station

Delivering Decarbonisation - Middlefields Waste Transfer Station

RPS Group was appointed to design and deliver a rooftop solar pv system for Middlefields Waste Transfer Station through the NEPO Decarbonisation Framework. Operated by South Tyneside Council,

View Case Study
Winsford Lifestyle & Christleton Leisure Centres

Winsford Lifestyle & Christleton Leisure Centres

RPS delivered M&E works across two Leisure Centres as part of a Public Sector Decarbonisation Scheme by Cheshire West & Chester Council. Our M&E Division designed and undertook the installation of

View Case Study


This site uses cookies that enable us to make improvements, provide relevant content, and for analytics purposes. For more details, see our Cookie Policy. By clicking Accept, you consent to our use of cookies.